Tenant Repair Request Checklist
Table of Contents
Introduction
Use this internal staff workflow after a tenant has reported a repair. Capture a clear fault and room/asset reference, triage the case, confirm authorized work and access, track the visit, and verify the original issue before closure.
Play follows the handling sequence. List shows the full case, and Form gives staff an overview of the same description, appointment and verification fields. These are internal records; the checklist does not create a public repair-request form.
Use the property’s approved request system, emergency contacts, access process and spending authority. Keep tenant contact details and sensitive access information in that system, with only the necessary operational references here.
Prefer guided mode? Try Play - answer one question at a time in full screen view.
Download or Print this Tenant Repair Request Checklist
Get a printable version of this checklist in your preferred format: PDF, Word, Excel, or print directly from your browser.
Presented by:
Checklist.com
Stats
Views
11
Views: 11
Uses
0
Uses: 0
Tasks
29
Tasks: 29
Details
A useful repair record distinguishes the reported symptom, approved scope, work claimed complete and verified outcome. Each has its own field so a contractor visit or invoice cannot silently stand in for resolution.
For example, a basin leak may be reported repaired but still appear during normal authorized use. Record the continuing symptom and verification evidence, assign the next action and keep the case open in the property system.
Who it's for
How to use
- Save a Checklist for one reported repair or a reusable staff Template. Enter the case/unit reference, received time, fault, room/asset and accepted owner.
- Use Play for case handling, List for all steps, or Form to review the answer record. Apply the property’s urgency process immediately; do not delay emergency escalation to complete fields.
- Record approved scope, work/spending authority, contractor, lawful access status and the actual appointment window. Confirm that the tenant and contractor have the arrangement.
- Record the visit and actual work. Give a missed visit, changed scope or delay an accepted next action, update commitment and review time in the approved request process.
- Record completion evidence, the agreed original-fault check, result, verifier and time. Close only through the authorized property process; otherwise carry the case forward and update the tenant.